What we produce
- Floor plans, reflected ceiling plans, roof plans, enlarged plans
- Building and wall sections, elevations, details
- Door, window, room and finish schedules
- Tags, keynotes, dimensions and annotations to your standard
- Redline markups picked up and returned as a revised PDF set
Standards
US sheets follow the US National CAD Standard sheet naming and AIA CAD layer guidelines, or your firm's own standard if you send it. UK and Irish sheets follow your BEP under ISO 19650. Units are whatever your office uses.
Fast redline loops
Redlines come back by email or as markups in your ACC. We log each comment, apply it and return the revised set with every change listed, so your reviewer checks the list instead of the whole set.
Questions
Do you stamp or sign construction documents?
No. We produce the sheets; your licensed architect or engineer reviews, signs and seals them.
Can you use our title block?
Yes. We work white-label under your title block and your firm name.
How fast are redline pick-ups?
It depends on volume, and the quote shows a date. Small redline sets usually come back within one to two business days.

